Sunday 2 November 2014

The Progress

Month Review

As this blog has been online now for a month, with work on the van just over that period, I thought I would have a quick run down of what's done and what needs done.

So over the past month the van was stripped, floored, windows tinted, layout planned, vents cut, worktop made, wetroom built, kitchen unit built plus few other things.

Next things are to finish wetroom, put in electrics, gas, water. Also to build the sofa/bed frame, the material is here for the foam and the curtains which should be started soon.
And fitting the Solar Panels which I aint looking forward to doing!

Also got a lot of parts ordered such as shower, fan/vent, few electrical bits and some other bobs...

Spent a fair bit, probably heading over budget but hey these things happen... I have tried not to scrimp plus going Solar and getting a new Smev pushed that up a fair bit.

As I mentioned, work will take precedence now plus the colder weather is here, so I predict Nov/Dec will slow down a fair bit.

Hopefully all going well it will still be finished by March though :)