Tuesday 28 October 2014

The Base

Getting down to size

I'd already cut out the shower tray but now the partition and frame was started, I could do a 2nd fix on it and I had 2 out the 4 walls to line up with.




So I have left 10mm round the edges which will allow for the ply and the PVC panels to be fitted.

I used 38 x 89mm CLS to build the frame for the base to sit on, this gives enough room to sink the shower tray in and all it will require under the tray is a bit of foam to prevent it sagging a couple of mm and cracking.




Just need to figure out what am doing with the ceiling for the wetroom and then the holes in the floor and van roof for the draining and ventilation.





No comments:

Post a Comment