It's been 2 months now since the blog was started, and despite me saying last month that things would have slowed down in Nov, they didn't really when looking back.
The wetroom frame was finished so I ply lined it and put the PVC panels up. Also the shower plinth and shower rod/head installed plus the fan/light was installed.
I built both sections of the sofa/bed, installed the 240V electrics and ran the cable to 2 sockets.
Also did all the wiring for the 12V electrics and ran all the cables up to the control panel. Plus installed 2 LED lights and colour LED lights too.
Also put in the gas bottle straps, put in a couple of drop vents, installed the gas pipes to the appliances and made sure they were working.
On the water side of things, I put all the pipes in, put in fresh water containers, connected up the taps and relay wiring. Still to complete the waste side of things but have the necessary parts.
And also did the wooden panels under the sofa bed, and built a wardrobe too.
Currently the foam is being re-upholstered and should be completed soon, then the curtains will be made.
Services wise, all that needs done is put in the 12V fridge connection, install the waste pipes for the sink/shower and source another gas bottle & regulator to test the boiler and water system out.
Wood work, I've still to build a gas bottle enclosure plus build a couple of overhead storage units. And finish the kitchen unit once I decide on what I am doing with it.
And then cover the partition, wardrobe and under the sofa with veltrim.
This month won't see a lot done, need to get Christmas out the way and wait till I can fund the rest of the finishing touches.
And again over 4000 views overall on the blog, so thanks again for reading.