Now the frame was finished, I was hoping that when I done the shower tray measurements that it all fitted in.
The back off the toilet needs screwed onto the frame, and then the toilet clips on to 3 hooks at the back to hold it in place.
It fitted fine at eithe side, enough room to put the ply and the PVC panels in, but was having a problem at the back.
I needed to put a couple of extra batons on each side, to bring it forward so the toilet lines up with the shower tray and then gets sealed.
It still needs a slight adjustment which I will do when I go to panel the walls, but it will look something like this when done.
No comments:
Post a Comment