3 Month Review
Firstly, as expected not a lot has been done in the last month,
I put some Veltrim up to cover the partition etc, put a couple of poles up, installed the table mounting and fitted the boiler exhaust.. and that has been it!
Now the festive season is out the way, and soon as I can get the bank balance back in the black, I will get on with it.
First job of the year will be to get rid of the damn tail-lift, as it's in the way of me doing the drainage for the shower.. can't even give the thing away :(
Happy New Year to you all
x
No comments:
Post a Comment